Roughly 1 in 3 Resi-Tech surveys in 2026 now includes an EV charger. Planning it into the surface (rather than after) saves cost and looks better.
Cable routing
We coordinate with your electrician to lay ducting under the sub-base before the resin goes down. No lifting slabs, no surface-mounted trunking, no aesthetic compromise.
Charger position
Position near the driver's side of the parking bay, 1.0–1.2m off the ground, with slack cable to reach either side. We map this at survey.
Future-proofing
Lay a spare 25mm duct at the same time — a second charger later costs almost nothing to add if the duct is already there.